Schedule view
The Schedule view shows every planned operation on a timeline, grouped by work center and production line. It answers "what runs where, and when?"
Reading the schedule
- Each row is a work center or one of its production lines.
- Each bar is an operation from a production order. Its length reflects how long the work is expected to take.
- Bars follow your working calendar, so non-working time such as weekends or closed shifts is respected.
Rearranging work
- Drag a bar left or right to move an operation earlier or later.
- Drag a bar up or down to move it to another production line in the same work center.
- Drop it in place. Raseel saves the change to Business Central straight away, so everyone sees the same plan.
Tips
- Operations in a routing run in order. Moving one step can affect when the following steps can start.
- Check the Load view after big changes to make sure you have not overloaded a work center.
- Operations already running or finished should be left in place; move the work that has not started.