Schedule view

The Schedule view shows every planned operation on a timeline, grouped by work center and production line. It answers "what runs where, and when?"

Reading the schedule​

  • Each row is a work center or one of its production lines.
  • Each bar is an operation from a production order. Its length reflects how long the work is expected to take.
  • Bars follow your working calendar, so non-working time such as weekends or closed shifts is respected.

Rearranging work​

  • Drag a bar left or right to move an operation earlier or later.
  • Drag a bar up or down to move it to another production line in the same work center.
  • Drop it in place. Raseel saves the change to Business Central straight away, so everyone sees the same plan.

Tips​

  • Operations in a routing run in order. Moving one step can affect when the following steps can start.
  • Check the Load view after big changes to make sure you have not overloaded a work center.
  • Operations already running or finished should be left in place; move the work that has not started.